By Bob Dikman

I am pleased to announce we will complete construction of our brand new 30,600 square foot WATERFRONT building by the end of August.

Located in the Tampa East Industrial Park, central to major arterial highways and interstates, this dock-high, 24 foot clear height, front-load building sits directly on the Tampa Bypass Canal – with 2,100 square feet of office space overlooking the water.  Where else can you get waterfront office space in an industrial building?

Additional building features include:

  • LED high-bay lighting
  • Three-phase power
  • Four dock-high overheads
  • One grade-level drive-in door
  • Upgraded finishes in the office area
  • Waterfront patio

The new building will accommodate all industrial uses, including manufacturing, processing, assembly, storage and distribution.

As the Tampa Bay area has continued to grow, the demand for high-quality industrial space has outpaced existing supply.  This will be the third standalone building we have brought to the market for lease in the last year.

Please contact Erika Matscherz at 813-215-4343 or erika@www.dikman.com for more information.

 

Another Victory for Michael Christensen and Porsche

On the racing front, it’s been a banner summer for Michael Christensen.  Michael, a Porsche Factory driver I spotted for in the IMSA Weather tech series throughout 2017, has just won the 24 Hours of Le Mans for Porsche in the LMGTE Pro class.

Winning the LMGTE Proc class is a great accomplishment and was a career goal for Michael.  He was also the winner of the Rolex 24 last year.

Let’s hope he keeps up his winning streak!

From left to right: Michael de Quesada, Michael Christensen and Bob Dikman at Watkins Glen 2017